A&A TO EXISTING BAXTER FACTORY AT
2, WOODLANDS INDUSTRIAL PARK D, STREET 2 – INSTALLATION OF SOFTENER TANK & DUAL MEDIA TANK UTILITIES AND DISTILLER NO 5 UTILITIES & PLINTH CONSTRUCTION WORK
(P.O NO: 156000)
Supply, delivery and installation of related M&E services & Utilities Piping works and construction
of plinths
ALCON LABORATORY – WEIGH BOOTH PROJECT @ NO 19, TUAS SOUTH AVENUE 14
Supply and installation of Air Conditioning & Mechanical Ventilation Services
NOVARTIS SGBO PHASE 2 PACKAGE PROJECT AT 40A, TUAS SOUTH AVENUE 6
PACKAGE TITLE: MVAC SYSTEMS, UTILITY PIPING AND BMS INSTALLATION WORKS
Supply, delivery and installation of Utility Piping System, MVAC Ducting System and Building Management System
SGBO2-TC-015 MVAC Package (Finalised Value)
SGBO2-TC-020 Utility Piping Package
SGBO2-TC-017 BMS Package
PROJECT: ALCON ITC PROJECT AT
19, TUAS SOUTH AVENUE 14
PROJECT NO: 451581
LLP PACKAGE NO: 451581.TP1740.001
PACKAGE TITLE: MVAC, FIRE PROTECTION AND PLUMBING WORKS
Design, Construction, Supply, Installation and Commissioning of MVAC, Fire Protection and Plumbing Works
DEVELOPMENT LABORATORY EXPANSION AT LONZA CELL THERAPY PROJECT SINGAPORE
AT TUAS SOUTH AVENUE 6,
SINGAPORE 637377
PROJECT NO: 11812
PACKAGE / ALLOCATION NO: 1.TP1206.001
TRADE CONTRACT: L1 MVAC SHEET
Supply, Installation, Testing and Commissioning of L1 MVAC Sheet-Metal. Test & Balance and Insulation Works
PROPOSED ADDITIONS & ALTERATIONS TO THE EXISTING SINGLE-USER FACTORY ON LOT 01317X MK 13 AT NO 2, WOODLANDS INDUSTRIAL PARK D (EXTENSION OF SHIPPING “C” CONTRACT)
Supply, delivery and installation of Electrical & Fire Protection Services, Plumbing & Process Waste Piping, Process Air Piping and Builder’ s Work
NOVARTIS SGBO2 PHASE 2 – UTILITY PIPING AT 40A, TUAS SOUTH AVENUE 6
WWP, WWT SYSTEM UPGRADING FROM PRODUCTION LEVEL 1 TO EXTERNAL AREA WASTE WATER TANK
NOVARTIS PO NO: 4500613995
Supply, delivery and installation of the Utility Piping System
LONZA CELL THERAPY PROJECT SINGAPORE @ TUAS SOUTH AVENUE 6
PROJECT NO: 118182
PACKAGE NO: 0. TP1118.005
CONTRACT FOR CLEANROOM SYSTEM
Design, Construction, Supply & Delivery, Installation, Testing & Commissioning of
Cleanroom System
LONZA CELL THERAPY PROJECT SINGAPORE @ TUAS SOUTH AVENUE 6
PROJECT NO: 118182
PACKAGE NO: 0.TP1206.001
MVAC SHEET METAL, TEST & BALANCE AND INSULATION
NOVARTIS XOLAIR PROJECT
PROJECT NO: 1759X0
PACKAGE TITLE: MVAC AND UTILITY PIPING WORKS / PACKAGE NO: SGBO2-TC-O15
LENDLEASE PO: 12040007234
Supply, delivery and installation MVAC Ducting
and Utility Piping System