REPLACEMENT OF AIR HANDLING UNITS & ASSOCIATED WORKS TO EXISTING BAXTER FACTORY AT 2, WOODLANDS INDUSTRIAL PARK D, STREET 2 – FOR ASSEMBLY I-I PRODUCTION ROOMS AND ASSEMBLY I-I PACKING ROOM
(PO NO: 433050 & 433052)
Supply, delivery and installation of Air Handling Units (AHU #14 & #15) c/w all the associated ductworks, pipe works, etc.,
LONZA BIOLOGICS BIOREACTOR SINGAPORE PLANT 2 AT NO 35, TUAS SOUTH AVENUE 6
PIPING & INSULATION, MVC DUCT WORKS SYSTEM
Supply, delivery and installation of Piping and Insulation and MVAC Ductwork System
KIEFEL ROOM EXPANSION PROJECT FOR SAPA MACHINE FOR EXISTING BAXTER FACTORY AT 2, WOODLANDS INDUSTRIAL PARK D, STREET 2
(PO NO: 433064)
Supply, delivery and installation of new Cleanroom AHU, ACMV ducting, ceiling work, epoxy coating for flooring, new electrical cables to SAPA Machine, Air Compressor and Exhaust Pipeline System
PROPOSED THERMO FISHER SCIENTIFIC BIOPRODUCTION – DESIGN & INSTALLATION OF MECHANICAL & ELECTRICAL WORKS AT NO 25, TUAS SOUTH STREET 1,
SINGAPORE 648034
Supply, delivery, installation, testing and commissioning of Air-Conditioning & Mechanical Ventilation System, Electrical Engineering Services, Cold Room Construction, Cleanroom Monitoring System, Compressed Air System, Dust Collector System and Smoke Exhaust System
PROPOSED A&A TO THE EXISTING SINGLE-USER FACTORY ON LOT 01317X MK 13 AT 2, WOODLANDS INDUSTRIAL PARK D – A&A TO THE SOLUTION PLANT PROJECT
Supply, delivery, Installation of Architectural Building Works, Air-Conditioning & Mechanical Exhaust System, Electrical Services, Fire Protection Services, Process Waste & Potable Cold-Water Supply Services, Process Air and Lab Gases Piping Works
NOVARTIS – ETHANOL STORAGE & PROCESS VENT AT EXISTING FACILITY OF 40A, TUAS SOUTH AVENUE 6, TUAS BIO-MEDICAL PARK
PACKAGE TITLE: MVAC – DESIGN & BUILT OF
THE ETHANOL STORAGE BUILDING
LENDLEASE PO NO: 12040006391
Supply, delivery and installation of Civil, Structural & Architectural Works, Electrical System, Building Automation System, MVAC System & Fire Protection System
PROJECT: ALCON BOILER AND COMPRESSOR PROJECT AT 19, TUAS SOUTH AVENUE 14
PROJECT NO: 451431
LLP PACKAGE NO: TP1740.001
PACKAGE TITLE: MECHANICAL AND PIPING PACKAGE
Design, Construction, Supply, Installation and Commissioning the Mechanical and Piping Package for the Duel Fuel Boiler, Compressor & Air Dryer, Diesel Tank & Diesel Pumps, Chemical Treatment and Fire Protection Services
NOVARTIS SGBO2 PHASE 2 –
GP2015 CONTRACT AT 40A, TUAS SOUTH
AVENUE 6, TUAS BIO-MEDICAL PARK
PKG TITLE: GP2015 MVAC & UTILITY PIPING SYSTEMS (INCLUDING COOLING TOWER)
LENDLEASE PO NO: 12040006312
Supply, delivery and installation of Cooling Tower c/w associated piping & electrical
works and Chemical Water Treatment System
PROPOSED ADDITIONS & ALTERATIONS TO THE EXISTING SINGLE-USER FACTORY ON LOT 01317X MK 13 AT NO 2, WOODLANDS INDUSTRIAL PARK D (BAXTER SGR – CANOPY & STAGING EXTENSION CONTRACT)
Supply, delivery and installation of Architectural & Builder’s Work, Mechanical Ventilation Services, Electrical System, Sprinkler System and Security System
AMGEN HWFI EXTENSION PROJECT – PROPOSED ERECTION OF A SINGLE-USER LIGHT INDUSTRIAL ON LOT 04766P AND 04924M MK 07 AT 1, TUAS VIEW DRIVE (TUAS PLANNING AREA)
PROJECT NO: 254701 –
SUB-CONTRACT NO: 43031.01
PACKAGE TITLE: BLACK UTILITY PIPING (INCLUDING TIE-INS)
Supply, delivery and installation of the complete Black Utility Piping Works including tie-in works