A&A TO FLEX CLEANROOM – REARRANGEMENT AND INSTALLATION WORK TO EXISTING 3M FACTORY AT WOODLANDS AVENUE 7
(3M PO NO: 428284)
(Contract Value: S$225,545.00)
Supply labour, tools and materials to do alterations & additions to the existing Cleanroom including all necessary M&E hook-up & re-instatement work
A&A TO FLEX CLEANROOM – RELOCATION AND DISMANTLING WORK TO EXISTING 3M FACTORY AT WOODLANDS AVENUE 7
(3M PO NO: 428285)
(Contract Value: S$135,160.00)
Supply labour, tools and materials to dismantle and relocate one lot of
machines including related hook-up works
SEAGATE W2 AT 90, WOODLANDS AVENUE 7 – REPLACEMENT OF ISOLATING VALVES ON CONDENSER WATER PIPES FOR CHILLERS, COOLING TOWERS AND CONDENSER WATER PUMPS (PO NO: WUS46044102 & WUS4604088C)
Supply, delivery and installation of isolating valves including all required dismantling work for the condenser water piping system
MHU1326-MECHANICAL PACKAGE – PROPOSED SG9 MECHANICAL INSTALLATION PACKAGE FOR THE EXISTING EXTENSION OF A NEW 3-STOREY SINGLE-USER FACTORY BUILDING AT TUAS LINK 4 (3M TUAS 2) PO NO: 382618
Supply, delivery, installation, testing and commissioning of the Chilled Water & Process Chilled Water Piping System, Process Utility Piping System, MVAC Ducting System and Sprinkler System
PROPOSED MRX 2 LINE PROJECT – F02 HVAC AND PIPING PACKAGE FOR 3M’s EXISTING FACTORY AT 2, TUAS LINK 4 3M PO NO: 377483
Supply, delivery, installation, testing and commissioning of the ACMV & Process Ducting, installation of pre-supplied Chilled Water Equipment, Chilled Water Piping System, Process Cooling Water System and Process Piping for Nitrogen Gas, Compressed Dry Air, Natural Gas, Hot Oil, Lube Oil, Vacuum Piping, Hydraulic Oil and CO2 Gas
PROPOSED A&A TO EXISTING 3M FACTORY AT NO 2, TUAS LINK 4, JURONG – BFL LAB AT 1ST STOREY WAREHOUSE AREA
Supply, delivery and installation of Architectural Works and ACMV System
PROPOSED A&A TO EXISTING ARCHITECTURAL WORKS AND CONSTRUCTION OF WWC CLEANROOM (PHASE 1) TO EXISTING 3M FACTORY AT NO 2, TUAS LINK 4, JURONG –
Supply, delivery and installation of Architectural Works, Cleanroom Construction and Mechanical Services comprising ACMV and Automatic Control System
PROPOSED A&A WORKS TO EXISTING 3M FACTORY AT WOODLANDS AVENUE 7 – DYNAMAR CONTRACT
Supply, delivery and installation of Architectural Works & Mechanical Works
PROPOSED CLEANROOM EXTENSION (PHASE 2) TO EXISTING 3M FACTORY AT WOODLANDS AVENUE 7 – LAMINATOR CLEANROOM & MATERIAL TRANSFER ROOM EXTENSION
Supply, delivery and installation of Architectural Works, Cleanroom Construction and M&E ACMV System
PROPOSED MODIFICATION OF LAMINATOR AND SP-2 10K CLEANROOM EXTENSION TO EXISTING 3M FACTORY AT 100, WOODLANDS AVENUE 7 – PCT CLASS 10K CLEANROOM EXTENSION PROJECT
Supply, delivery and installation of Architectural Works & M&E ACMV Services