MAPLETREE INVESTMENTS PTE LTD

PROPOSED NEW ERECTION OF 4-BLOCKS OF 14/17/18 STOREY BUSINESS PARK DEVELOPMENT WITH AMENITIES, 1ST & MEZZANINE FLOOR CARPARKS AND A&A INCLUDING CHANGE OF USE OF EXISTING 10-STOREY COMTECH BUILDING FROM LIGHT & HIGH INDUSTRY TO BUSINESS PARK USE ON LOTS 03912M & 03914V MK 03 AT PASIR PANJANG ROAD (QUEENSTOWN PLANNING AREA)

Sub-contract for Design, Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Air Conditioning, Mechanical Ventilation and IBMS Installation

BAXTER BIOSCIENCE MANUFACTURING SARL SINGAPORE BRANCH

PROPOSED EXTENSION OF A NEW 4-STOREY FACTORY WITH 2-STOREY WASTE WATER TREATMENT PLANT AND A&A TO THE EXISTING SINGLE-USER FACTORY FOR BAXTER BIOSCIENCE MANUFACTURING SARL SINGAPORE BRANCH

Supply and installation of Air Conditioning & Mechanical Ventilation System and Process Piping System

3M INNOVATION SINGAPORE PTE LTD

SG4A – PROPOSED NEW DRYER HOOK-UP WORKS CONTRACT FOR 3M EXISTING FACTORY AT NO 2, TUAS LINK 4
(3M PO NO: 428682 $316,200.00)
(3M PO NO: 433861 $739,800.00)

SEAGATE TECHNOLOGY INTERNATIONAL

PROPOSED CLEANROOM FIT-UP WORKS TO 1ST & 3RD STOREY AND MINOR A&A TO EXISTING 3-STOREY SINGLE USER FACTORY WITH 4-STOREY UTILITY BUILDING AT WOODLANDS AVENUE 12 AND WOODLANDS AVENUE 5

Supply, Delivery, Construction, Testing and Commissioning of Mechanical Installation Works (Package A) comprising;
Main Air-Conditioning System, Smoke Extract & General Exhaust Mechanical Ventilation System, Solvent Exhaust System, Acid Fume Scrubber Exhaust System, Chilled Water Process Cooling Heat Exchanger System and related FMS Control System

SEAGATE TECHNOLOGY INTERNATIONAL

PROPOSED CLEANROOM FIT-UP WORKS TO 1ST & 3RD STOREY AND MINOR A&A TO EXISTING 3-STOREY SINGLE USER FACTORY WITH 4-STOREY UTILITY BUILDING AT WOODLANDS AVENUE 12 AND WOODLANDS AVENUE 5

Main Contract includes the complete Project Management of the following: –
Design development, supply & installation of Cleanroom and its Fit-Ups;
Mechanical, Electrical, Process (MEP) Installation Works including Facilities Management System

MICRON SEMICONDUCTOR ASIA PTE LTD

ELECTRICAL & MECHANICAL FACILITATION FOR TSV PILOT LINE AT CLASS 1K CLEANROOM AT SOUTH-EAST BUILDING LEVEL 2 OF EXISTING MICRON BUILDING AT 990, BENDEMEER ROAD

Supply, delivery, installation, testing and commissioning of Electrical Services for Additional Load Centre and Mechanical Services

LANXESS BUTYL PTE LTD

BTR SINGAPORE PROJECT ON JURONG ISLAND CHEMICAL PARK FOR LANXESS BUTYL PTE LTD

Supply, delivery and installation of the complete ACMV System for Cafeteria, Admin Building, Totes Storage, Bromine Building, Finishing & Products Buildings, Sub-Station 1 & Fire Pump House

MICRON SEMICONDUCTOR ASIA PTE LTD

FACILITATION OF L3 SE WING –
MSA 1.5 TEST EXPANSION PROJECT TO EXISTING MICRON BUILDING AT
NO 990, BENDEMEER ROAD

Proposed Architectural, Mechanical & Electrical Services, Controls, Fire Protection Services and Process Utilities Installation Works

3M INNOVATION SINGAPORE PTE LTD

PROPOSED NEW ERECTION OF A 3-STOREY SINGLE-USER FACTORY DEVELOPMENT COMPRISING A BLOCK OF 3-STOREY BUILDING WITH 1-STOREY WAREHOUSE AND 3-STOREY ANCILLARY OFFICE WITH CANTEEN, GUARDHOUSE AND A SUB-STATION ON MK 07 LOT 03373C PT (PLOT A1289500) AT NO 2, TUAS LINK 4

Proposed MVAC, Chemical & Utilities Piping Hook-Up and Other Related Works Comprising: –
SG4A HOOK-UP, COMPOUNDING ROOM & TANK FARM ROOM HOOK-UP
SG3-ZAL INSTALLATION WORKS
SG4B MECHANICAL HOOK-UPS
SG4B RTO HOOK-UP
SG4B CLEANROOM WALL PARTITION & ADDITIONAL NOZZLE INSTALLATION
SG2 & SG4B ROOF OPENINGS

3M INNOVATION SINGAPORE PTE LTD

PROPOSED 3M LABORATORY IN EXISTING AGLIENT BUILDING AT NO 1, YISHUN AVENUE 7

Supply and installation of Air Conditioning & Mechanical Ventilation System